0 0
Read Time:1 Minute, 39 Second

 Jim Bova’ Project 2

 

This 4th installment of Project #2 is a collection of small projects that We have been doing. As soon as the warmer weather comes back I plan on doing CJ front springs in the rear with M/L’s and Sammi rear up fronts as well as a welded rear.  I also have a pony carb that I will install because the stocker seems like it may need a little work and I figure it will be easier to install the pony. During the winter I plan to make seat mounts to mount the seats I found along the roadside in a junk pile.          Click to see a larger shot... Typical rust problem under the plastic rocker covers.  Click to see a larger shot... Rocker ground clean and primed waiting for the cover.  Click to see a larger shot... I/4 inch aluminum rocker covers that I made, pop riveted on.              Click to see a larger shot... Side view of the installed rockers.              HINGE CUTTING        HOMEMADE BUMPER Click to see a larger shot... Jimbo using the sawzall to gut the door hinge. (not plugged in)      Click to see a larger shot... Jimbo grinding all the rust of the bumper  steel. (Plugged in)              Click to see a larger shot... Shocks that were on #2 when I bought it. Tried to sell them but got no takers.              Click to see a larger shot... Cut hinge.      Click to see a larger shot... Bought a mig welder and tried my hand at bumper building. Here it is so far.          Click to see a larger shot... Seats found in a road side junk pile. I was told they were out of a Mazda Miata.      Click to see a larger shot... Since I got the “new” engine in, it has always been tough to start. Took the starter out and notice this bushing moving back and force. A friend gave me a replacement. I’ll fix this in time.                  08/11/10 14:50

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply